English

KYE Mould Techenology Limited

Home ProductsDie Casting Mould

EDM Manching PS ABS PP PMMA 1.2738 Die Casting Mould

EDM Manching PS ABS PP PMMA 1.2738 Die Casting Mould

  • EDM Manching PS ABS PP PMMA 1.2738 Die Casting Mould
  • EDM Manching PS ABS PP PMMA 1.2738 Die Casting Mould
  • EDM Manching PS ABS PP PMMA 1.2738 Die Casting Mould
EDM Manching PS ABS PP PMMA 1.2738 Die Casting Mould
Product Details:
Place of Origin: China
Brand Name: KYE
Certification: ISO9001:ISO14001
Model Number: OEM
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: To Be Negotiation
Packaging Details: Wooden Case With Steel Frame
Delivery Time: 30 working days
Payment Terms: T/T
Supply Ability: 50 Sets Mould Per Month
Contact Now
Detailed Product Description
Part Mateiral: Aluminum Alloy Mold Type: 2 Plate-mold
Useage: Furniture Accessories Mold Material: P20/718/738/NAK80/S136, NAK80, S136, P20, 718H
Mold Base Material: S50C LKM, DME, LKM & HASCO & DME, HASCO, LKM Mould Base Part Surface: EDM Manching
High Light:

1.2738 Die Casting Mould

,

PP PMMA Die Casting Mould

,

PS ABS Die Cast Mould

EDM Manching PS ABS PP PMMA 1.2738 Die Casting Mould

 

Product Details Description

Part materials Aluminum A380/ADC12/A356/ADC12, zinc...Metal...etc.
Quality ROSH and SGS standard
Size According to your drawing
Mould Base S50C HASCO standard, European standard, World standard
Mould Base Material LKM, FUTA, HASCO, DME, etc. or as per customer’s requirement.
Surface Finishing Texture (MT standard), high gloss polishing
Cavity / Core material P20, 2311, H13, 2344, Starvax 420, 236,AdC3, S136, 2312, 2379, 2316, 2083, Nak80, 2767 etc.
Cavity Number Single cavity, Muti Cavity, based on customer’s requirement.
Design & Program Softwares CAD, CAM, CAE, Pro-E, Solid works…etc.
Mold building lead time 30~50 days after mold 3D approved, parts measurement report (upon required).
Annual production 300-400 sets of mold
Mould Base S50C HASCO standard, European standard, World standard
Mould Base Material LKM, FUTA, HASCO, DME, etc. or as per customer’s requirement.
Surface Finishing Texture, high gloss polishing,powder coating,laser cutting, Chrome, electro-plating
Cavity / Core material P20, 2311, H13, 2344, Starvax 420, 236,AdC3, S136, 2312, 2379, 2316, 2083, Nak80, 2767 etc.
Cavity Number Single cavity, Muti Cavity, based on customer’s requirement.
Design & Program Softwares CAD, CAM, CAE, Pro-E, Solid works…etc.
Mold building lead time 30~50 days after mold 3D approved, parts measurement report (upon required).

 

 

EDM Manching PS ABS PP PMMA 1.2738 Die Casting Mould 0

Our Service

1. New project/design development assistance, base on customer’s samples or design drawing;

2. When the customer encounter bottleneck, give them some technical assistance;

3. Help the customer complete the 3D design drawing;

4. Simulate the effect of the product by simulation software and offer the simulation report;

5. Test Mold: Test Mold and Sample Making;
6. Delivery Mold: Delivery to Customer;

7. Product Making;

8. After Sale Information Communication.

 

OUR ADVANTAGE

1. We own mould department and injection department, we can offer the prototypes, the mould design, mould making and injection production.

2. Provide milled prototype making, mold design, mold making, mold testing, molding, products assembly….services

3. Our quality, price, after sale services are reeally competitive.

4. Direct manufacturer and factory price.

5. Accept only OEM / ODM / Customer Projects. We do not have anyexisting molds for sell.

6. ISO cetified and good guarantee.

7. Mold building lead time : around 20~60 days, with 1st mold tra;omg report and mold trailing samples.

8. We have dstrong R & D team and customize design is available, to meet our customer high demands and expectations on products quality and productivity.

 

What kind of information need for Plastic Potty Mould quotation?

1, Sample photos with size or 2D/3D design or actual sample.

2, MOULD Cavity quantity

3, Runner type, cold runner or hot runner

4, Mould steel type,P20, 718, 2738,H13,S136,2316,and so on.

5, Injection machine parameter or Potty size(tie rod distance)

 

Project process

Quote According to sample, drawing and specific requirement.
Discussion Mold material, price, payment, etc.
Advance Payment by proforma invoice.
Product Design Checking We check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report.
Mold Tooling We start to make mold after mold design confirmed.
Mold Processing Send report to customer once each week.
Mold Testing Send trial samples to customer for confirmation.
Mold Modification According to customer’s feedback.
Delivery Delivery by sea or air. The forwarder can be designated by your side.

 

We can work out total cost of the project and the cost per piece.

If you are saling some products now, we can help you to develop better products idea and manufacturing it with the best possible solution supply chain in China, including product packing and printing supply. Looking for the inquiry from you.

 

Contact Details
KYE Mould Techenology Limited

Contact Person: Mr. jeff

Tel: 0086 139 2681 9972

Fax: 86-769-8162-3892

Send your inquiry directly to us
Other Products